Drywall Patch & Paint
This customer lived on the 3rd floor of a multi-unit condo when their toilet supply leaked. The water damaged several rooms in their unit as well as traveled down into a couple of units below. Even though the building was built in the 2000s, asbestos testing was required due to the condo being in a multi-unit complex. The test results came back negative and we were able to cut out the affected drywall. Once the structure was dry our repair team went it to finish the work. They added insulation, patched the drywall, applied texture and paint to match, and installed a new baseboard.